Club 1905 | Australian Open
Project Summary:
Five hospitality areas, each with 3.6m walls, arches, and custom detailing throughout. The entrance set the tone with 23 MDF arches standing 4.5m high, all CNC cut and spray painted in-house.
Client
Tennis Australia
In-House Capabilities Used:
- CNC cutting
- Spray finish pre-painting
- Joinery
- 3D client drawings
- Detailed shop drawings

